One of the key challenges was the logistical management of removing hundreds of tonnes of materials including the removal of 19t rooftop generator by crane a live site situated at a busy junction in the heart of the City of London. This required careful coordination to ensure the safety of both pedestrians and vehicle traffic, alongside strict scheduling and traffic management to minimise disruption and maintain compliance with local authority requirements.