The second phase of works included the isolation and decommissioning of all MEP services back to incoming plant rooms within the Lower Ground level and to remove all redundant plant to the 7th and 8th floor level plant rooms.
Again logistics planning and management were the key factor for removal of debris from the site which was all carried out along the side road of the building that was also shared with the London School of Economics, used for both pedestrians and vehicular access on a daily basis. Attention was focused on liaising with the College building management and to manage and control the pedestrians and deliveries whilst loading was carried out.